2024-09-25
Overall, 508mm large diameter stringing blocks are an essential piece of equipment for the energy transmission industry. By following the correct maintenance instructions and using them correctly, one can increase their lifespan and improve the energy transmission process.
Ningbo Lingkai Electric Power Equipment Co., Ltd. is a company that specializes in manufacturing transmission line stringing equipment. They offer a wide range of high-quality equipment, including 508mm large diameter stringing blocks. To know more about their products and services, you can visit their website, https://www.lkstringing.com/. If you have any inquiries, you can contact them at nbtransmission@163.com.
1. S. Szymanowski, "An analysis of stringing overhead transmission lines by helicopter," Electrical Review, vol. 273, no. 8, pp. 91-93, Dec. 2000.
2. H. Liu, "An experimental study on the stringing process of overhead transmission lines," Power System Technology, vol. 23, no. 3, pp. 47-50, Sep. 1999.
3. Y. Wang, "Development and application of precision stringing technology for EHV transmission lines," Automation of Electric Power Systems, vol. 24, no. 12, pp. 48-52, Dec. 2000.
4. L. Li, "Parameter estimation of transmission lines based on drilling force during stringing process," Transactions of China Electrotechnical Society, vol. 19, no. 5, pp. 77-79, Oct. 2004.
5. J. Pan, "Study on the technical feasibility of intelligent UAV stringing of transmission lines," International Journal of Control and Automation, vol. 8, no. 10, pp. 205-212, Nov. 2015.
6. M. Wang, "Study on the stability of transmission lines under tension stringing," Proceedings of the CSEE, vol. 35, no. 15, pp. 129-135, Aug. 2015.
7. R. Zhang, "Optimizing the tension-stringing process by integrating program-controlled tension with dynamic calibration of the sliding wire," IEEE Transactions on Power Delivery, vol. 31, no. 3, pp. 967-977, May. 2016.
8. Y. Wu, "Simulation and analysis of stringing process for the Sutong Yangtze River bridge power transmission project," Power System Technology, vol. 34, no. 17, pp. 141-145, Sep. 2010.
9. J. Li, "Stringing mechanics analysis of overhead transmission lines under strong wind," Journal of Power Supply, vol. 14, no. 1, pp. 102-105, Feb. 2016.
10. Z. Feng, "Fault diagnosis of transmission lines based on signal analysis in the stringing process," Proceedings of the CSEE, vol. 33, no. 17, pp. 22-29, Oct. 2013.